Microsoft MN700 - Wireless 802.11g Base Station Router Uživatelský manuál Strana 4

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 8
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 3
4
7. As budget allows, send staff to conferences sponsored by the American,
Public, Connecticut, and New England Library Associations. 2007-2010. On-
going.
Visit exhibit booths of technology vendors
Attend workshops on relevant technology topics
8. Require all staff to attend at least one computer workshop per year. 2007-
2010. On-going.
All staff will obtain additional training in the use of Microsoft Office
applications, as needed. 2007-2010.
Administrative staff will obtain additional training in the use of website
software for both Town of Avon, and Library websites.
Appropriate staff will attend training on SIRSI (vendor name of integrated
library system) upgrades, as needed. 2007-2010. On-going.
Network Services
Goal: Improve and maintain network connections. There is a need to always provide
the fastest Internet connection as prompt delivery of information in electronic formats is
becoming the prevalent method of information transfer.
Action:
1. Provide budget for technical support with Zaktec LLC, increasing the budget
for the expanded building. 2007-2010. On-going.
2. Work with network consortium on upgrades of integrated library system
software, SIRSI Workflows, 2007-2010. On-going.
3. Conduct annual assessments of telecommunication services, hardware and
software inventory, plus systems and software upgrades needed for providing
optimal services. 2007-2010. On-going
4. Budget for the purchase and maintenance of hardware, UPS equipment
(uninterruptible power supply), and software (including upgrades), and
telecommunications cabling and equipment as needed. 2007-2010.
5. Upgrade Fortres Security software, 2008, on-going as needed.
6. Conduct annual reviews and revisions of technology needs and goals in
response to new developments and opportunities in technology as they arise
(i.e. RFID, downloadable books, new audio and video formats, online
databases, portable phone systems, etc.) 2007-2010.
7. Upgrade telecommunications wiring from Category 5 to Category 6 cable
during expansion construction, 2009-2010.
8. Hire a part time (20 hr./wk.) staff person for technical support of the library’s
network and telecommunications system. 2009-2010.
Wireless Services
Goal: Upgrade and maintain the wireless network throughout the Library.
Action:
1. Upgrade the existing wireless access points to current wireless standards,
2008, and possibly again in 2009-2010 after expansion.
2. Maintain the wireless access points, 2007-2010, on-going.
3. Increase the number of wireless access points to allow service in the
expanded building, 2009-2010.
Zobrazit stránku 3
1 2 3 4 5 6 7 8

Komentáře k této Příručce

Žádné komentáře